企业微信企业微信

企业微信客服二维码

微信扫码咨询(无需加好友)

客服电话023-67461439

企业入口
电话咨询电话 023-67461439
首页 > 职位库 > 海外招聘:太阳能土建工程师(CommsResources)

海外招聘:太阳能土建工程师普通招聘

面议
工作地点台湾
招聘人数2 人
岗位类型海外网络优化工程师
招聘类型普通招聘
学历要求不限
经验要求 不限
性别要求 不限
年龄要求25~40岁
语言要求不限
语言级别一般
网络要求其它
厂商要求其它
应 届 生可以接受应届生
有效日期-
发布时间2016-10-27
岗位职责及要求

Site Supervisor Site Engineer for Solar Energy project

太阳能项目现场工程师

 

Location: Malawi Blantyre and Lilongwe

工作地点:马拉维

 

Contract period: 12 months

合同期:12个月

 

Ideal candidate mainly needs to have experience for Civil work, TE installation and power system and good English communication.

 

Huawei will provide Visa, return airline tickets, medical insurance, local accommodation and transportation

 

 

Description of Daily Duties

 

1)                                     Planning

ü                                     RPMDRPM, Imp Man, PCM allocates sites to the site supervisor and the site Supervisor need to do his own planning for the implementation of these sites.

ü                                     Supervisor planning to conform to the Master plan from the RPMPCM.

 

2)                                     Site Survey (TSS)

ü                                     Arrange site access or special key with site owner.

ü                                     Obtain subcontractor and client or client contactors information and schedule all for TSS; confirm the schedule with all the attendees 24 hours in advance.

ü                                     Assist contractor in performing TSS.

ü                                     Ensure all parties to sign the hand written TSS document on site.

ü                                     Ensure to obtain the TSSR document back from the contractor on time

 

3)                                     Kickoff

Preparation

ü                                     Arrange site access or special key with site owner.

ü                                     Obtain subcontractor and client or client contactors information and schedule all for Kick off; confirm the schedule with all the attendees 24 hours in advance.

ü                                     Documents gather—TSSR, Material BOQ, Scope of work in contract, structure analysis report, approvals (such as Telkom Ref and MTNVodacomCellC approvalLandlord permission)

ü                                     Discuss the requirement for build with all parties on site.

ü                                     Compile site file with all documents required.

Actions on kickoff:

ü                                     Confirm drawing and layout on site, re-check the information in the TSSR and drawing, if any changes required first keep records then feedback to site design to apply the change order and submit VO to clients. In principle no change are allowed on kickoff. If requested by client in writing, we need to re-survey the site and the 8ta Regional Project Manager need to give a official change order to Huawei Regional manager.

ü                                     Re-confirm material BOQ on site—(CK material Huawei locally purchase material such as poles-brackets I-beams Special material that need to be purchased by the sub contractor

ü                                     Re-confirm scope of work on site—Choose from the contract draft;

ü                                     Kick off meeting minutes with attendees signature;

Output:

Finalized BOQ;

Finalized TSSRDrawing;

Kick off meeting minutes with attendee’s signature;

As-Build required other documents prepare;`      

 

 

4)                                     Material collection and check

ü                                     Ensure material is booked for the site.

ü                                     Ensure the contractor receive the DN.

ü                                     Arrange for contractor to collect material in time.

ü                                     Arrange access to deliver the outdoor cabinet and check for damages to the container.

ü                                     Ensure that the container are placed in the correct position and secured to the plinth.

ü                                     Assist contractor to do Huawei material check on site.

ü                                     Report all damages, losses or missing material to RPM.                                                                                                                                                                                                                                          

5)                                     Materials management

ü                                     Huawei main equipment delivery notes—MR specialist;

ü                                     CK material delivery notes—MR specialist;

ü                                     Antenna poles and antenna brackets—MR specialist;

ü                                     Material VO quantity confirm

ü                                     Scope of work confirmed on site basic on the contract

ü                                     Materials remain records per site—Battery CabinetSolar System EquipmentsConnectorsPower cableExisting Equipments on site.

ü                                     As-Build required other documents prepare;

 

6)                                     Progress monitor

ü                                     Daily report to RPMPCM

ü                                     Subcontractor team tools check and OHS documents and PPE equipments check.

ü                                     Progress control and monitor

ü                                     Milestone achievement forecast

ü                                     Power connection plan and implementation;

ü                                     Trouble shooting on site

ü                                     As-Build required other documents prepare;

 

7)                                     Subcontractor management

ü                                     Ensure contractor do risk assessment on site before commencement of work.

ü                                     Ensure subcontractor adhere to H&S requirements on site.

ü                                     Subcontractor team leader and team members daily work monitoring and performance judgment;

ü                                     Subcontractor team tools check and OHS documents and PPE equipment check.

ü                                     Daily quality control tick sheet tick and check;

ü                                     Subcontractor quality self-check results check;

ü                                     Implementation progress match the plan and follow the regional plan;

ü                                     Materials remain records per site—Battery CabinetSolar System EquipmentsConnectorsPower cableExisting Equipments on site.

ü                                     As-Build required other documents prepare;

 

8)                                     Quality management

ü                                     Site quality daily check and control;

ü                                     IQA – Perform IQA check on site with subcontractor and ensure that all snags are repaired.

ü                                     SQA – Ensure that the site adheres to all aspects of the SOW to pass SQA.

ü                                     FQA - Ensure that the site adheres to all aspects of the SOW to pass FQA.

ü                                     Invite Quality department to perform SQA when the site is ready.

 

9)                                     Alarm Check and Commissioning

ü                                     Download all required configuration files for rectifier, SAM ext.

ü                                     Download Data files.

ü                                     Check the site for alarms and assist to clear all alarms.

 

10)                                 As Build

ü                                     Check the quality off the ass build document supplied by the sub contractor and include all documents supplied by Huawei and 8.Ta.

ü                                     Submit the ass document to RPM.

 

11)                                 Time Management and Cost Management

ü                                     Ensure good planning in order to limit site visits to a minimum

ü                                     Plan site visits route to limit kilometers.

ü                                     Complete allocate sites in own time; limit overtime to conform to huawei policy.

 

12)                                 Monthly PBC

ü                                     Complete monthly PBC template and submit to RPM for review

 


联系方式
请在线应聘,企业同意应聘意向后才可以查看联系电话、邮箱
CommsResources
CommsResources
  • 所属行业通信教育/培训
  • 企业性质合资企业
  • 所在地区北京市
  • 公司规模100-500人
营业执照已认证,可放心应聘
 CommsResources 是一家全球领先的顾问公司.我们拥有优质的顾问团队,庞大的人力资源智库,为电信,能源,和ICT类公司提供人力资源招募和后期管理服务.CommsResources公司成立于1991年,凭借丰富的资源,和良好的国际网络,在过去的20年里,我们成功完成了超过1万个项目的人力资源配送,输送了超过55,000名专业电信工程师,遍及欧洲, 美国,中东 ,非洲,澳洲,和远东地区等140个国家. 我们为客户量身打造, 输送专业的电信人才, 从而减少了客户人力,后勤,维护等成本, 提高了运营效率.CommsResource的团队分布于欧美,中东, 非洲, 澳洲和东南亚,我们提供不同层次不同领域的顾问服务,其中包括网络规划,site acquisition,土建,安装, 调测, 整合, 交付, 运营维护,支持,网络优,以及各层次的项目 ...详情>>
该企业发布的其他职位
职位名称 工作地点 月薪 人数 经验 学历 发布时间
IPCC 顾问 海外 2000~20000 5 人 不限 不限 2015-08-04
招聘turnkey项目总监 台湾 面议 1 人 不限 不限 2011-11-05
VAS Engineer for Huawei Zambia 台湾 面议 2 人 不限 不限 2012-01-05
业软海外自由人 台湾 面议 4 人 不限 不限 2011-12-22
OCS海外自由人 海外 面议 2 人 不限 不限 2011-12-22
WCDMA PS 工程师 海外 面议 5 人 不限 不限 2011-12-15
PS 工程师 海外 面议 2 人 不限 不限 2011-12-15
无线网优工程师 海外 面议 1 人 不限 不限 2011-12-14
RF project manager (Senior Lev 海外 面议 1 人 不限 不限 2011-12-14
数通工程师(高级 中级 初级:各若干) 海外 面议 6 人 不限 不限 2011-12-03
核心网WCDMA-PS工程师 海外 面议 2 人 不限 不限 2011-11-24
VAS数据业务工程师(O&M) 海外 面议 3 人 不限 不限 2011-11-24
PS核心网工程师(O&M) 海外 面议 2 人 不限 不限 2011-11-24
海外数据业务维护顾问招聘 海外 面议 5 人 不限 不限 2011-11-23
招CDMA网优工程师,核心网CSPS工程师 台湾 面议 3 人 不限 不限 2011-11-09
WIS,IP MW ,3G RNC engineers 台湾 面议 4 人 不限 不限 2011-07-06
Access Network Designning工程师 台湾 面议 3 人 不限 不限 2011-10-18
海外招聘项目管理人员 台湾 面议 3 人 不限 不限 2011-09-29
CBS维护,SDP维护,DBA主机数据网络维护人员招聘 台湾 面议 5 人 不限 不限 2011-09-29
华为海外空缺岗位:(均为华为正式员工岗位) 台湾 面议 10 人 不限 不限 2011-09-27
3G 无线网络优化工程师 台湾 面议 1 人 不限 不限 2011-09-20
招募核心网PS和数通人才 台湾 面议 4 人 不限 不限 2011-09-15
海外急招聘通信人才, 台湾 面议 20 人 不限 不限 2011-09-01
海外招聘无线微波工程师  台湾 面议 5 人 不限 不限 2011-08-18
海外招聘核心网PSCS工程师,智能网FIN工程师 台湾 面议 4 人 不限 不限 2011-08-16
海外聘无线3G开局和维护工程师 台湾 面议 10 人 不限 不限 2011-08-16
海外聘VAS工程师,网优工程师 台湾 面议 3 人 不限 不限 2011-08-10
无线 核心网数通微波传送网工程师,项目经理 台湾 面议 10 人 不限 不限 2011-07-22
ocs engineer 台湾 面议 2 人 不限 不限 2011-07-09
INVAS Engineer 台湾 面议 1 人 不限 不限 2011-11-23